Contact Klean Gasification: Project Enquiries and Feasibility Studies
Contact Klean Gasification
Most gasification enquiries are answered faster when they arrive with four pieces of information: what the feedstock is, how much of it there is each year, where the site is, and what stage the project has reached. With those four facts, a technical reply is possible immediately instead of after three rounds of email.
What to Send
- Feedstock: end-of-life tires, plastics, municipal solid waste, biomass or a mixture, with any analysis you already hold.
- Tonnage: annual volume and how it varies through the year.
- Location: site, country and whether land, grid and permits exist.
- Stage: concept, feasibility, funded, or ready to procure.
- Products: whether you want power, process heat, syngas, hydrogen, SAF, methanol or ethanol.
What Happens Next
Your enquiry is routed to the scope that fits: a feasibility study, plant design and engineering, or full turn-key delivery as general contractor. Klean Industries supplies equipment, licenses scalable technologies on a build-own-operate basis, and carries design, engineering, procurement, construction and commissioning, so the scope can widen later without changing supplier.
Who You Are Talking To
Klean Industries is a gasification equipment supplier with delivered projects behind the conversation: an eco-industrial-park project in Germany integrating waste-tire gasification with plastic liquefaction, an integrated steam superheater fuelled by pyrolysis gas in Norway, and a 1 MW biomass gasification plant in Japan producing renewable electricity and biochar with Chubu Electric, Seiko Epson and Toyama.
No Obligation on the First Call
An initial conversation costs nothing and usually clarifies whether the project is a gasification project at all. If the honest answer is that your stream suits a different route, you will be told that early rather than sold a plant that will not perform.
Learn More:
Start Your Gasification Conversation
Send Klean Industries your feedstock, tonnage, location and project stage, and the enquiry reaches the right technical department the first time, whether the next step is a feasibility study or a turn-key plant.
What waste stream do you need to convert?
